The Foust Group provided extensive field blasting and coating services for EnLink Midstream, successfully executing work across more than 15 active pipeline locations stretching from North Louisiana down to Golden Meadow. The project demanded significant mobility and field efficiency, as our crews often traveled between multiple sites in a single day to meet EnLink’s demanding production schedules. Our scope included a combination of above-ground and below-ground surface preparation and coating applications to ensure comprehensive pipeline integrity.

Our teams performed abrasive blasting and power tool cleaning on various pipeline sections, risers, and fittings. We applied multi-coat protective systems according to EnLink’s precise specifications, including specialized below-grade and transition coatings to prevent corrosion.

The logistical challenge of coordinating multiple crews across a wide geographic area required optimized travel routes and close communication with EnLink’s field representatives. We maintained strict adherence to all safety and environmental policies, resulting in zero recordable incidents.

Due to our team’s efficiency and quality, we completed all work ahead of schedule and within the provided T&M budgets. This outstanding performance led to additional purchase orders and a continued partnership with EnLink Midstream. Our ability to adapt and deliver consistent results across numerous sites reinforces our reputation for operational excellence and reliability in the field coatings industry.

Ready to partner with a contractor that puts safety, quality, and innovation first?